Project: KMYARV12   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Howard Kaney   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:552.8
Total Flight Time:
Start/Last Date:Aug 17, 2020 - Jun 10, 2022
Engine:Rotax 912iS Sport
Panel:Dynon Skyview dual screen
 
Friendly URL: https://eaabuilderslog.org?s=KMYARV12

Home or Last Project Picture

Dec 05, 2021     Meticulous - (3 hours)       Category: Workshop
Garrett remeasured the flap control rod to verify the proper length (11-29/32”) and verified the torque arms were at the same height (they were within .016”) and then drilled the flaperon torque tube top holes.
Addison cut and finish sanded the remaining holes in the lower cowling.
Adam and Willem worked on the skin pieces for around the landing gear.
Brady found the center panel piece that ALREADY had the autopilot control holes in it! He had been working to cut them and place nut plates for the last week. Chalk it up to experience!
Richard and Harsh worked on their cross country flight plan and Harsh flew from HXF to MSN on the simulator.
We had a brief tutorial on aircraft engines and Larry showed them the C-85 engine entirely disassembled.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.